The accessibility of public transport to persons with reduced mobility is a priority for the Region. That is why Brussels Mobility is redesigning public spaces, including metro stations.

At the moment,  51 stations.pdf(PDF) (93.29 KB) are equipped in such a way that they can be reached up to the platforms without having to take thresholds or steps. The ambition is to make all 69 Brussels underground stations accessible in this way. To this end, a multiannual programme has been set up, making new stations accessible to PRMs every year.

Works in preparation and execution

Madou

Installation of 2 lifts. Lift 1 connects the platform towards Arts-Loi with the mezzanine, lift 2 connects the platform towards Botanique with the mezzanine and the ground floor.
Station accessible at the end of 2022

Park

Construction of four lifts as part of station renovation.
Station accessible in 2024

Anneessens

Installation of a lift

Station accessible in 2024

Simonis

Installation of 6 lifts

Station accessible in 2024

Horta

Construction of 3 lifts

The first lift to be installed is the one that will provide the link between the surface and the ticket office (level -1). It will be installed in the existing access to the station (staircase) which is located directly at the corner of Rue du Lycée and Chaussée de Waterloo. The other two lifts to be installed as part of the project are internal lifts that will link the ticket office to each of the station's platforms (level -2).

Station accessible in 2024

Jacques Brel

Construction of 3 lifts

The first lift to be installed is the one that will link the surface (road level) and the ticket office (level -1). It will be directly adjacent to the existing access to the station (escalators + staircase) which is located at the corner of rue de Glasgow and boulevard Jules Graindor. The other two lifts are internal lifts that will link the ticket office to each of the station's platforms (level -2).

Station accessible in 2023
Planning permission requested

Planning permission application in progress

  • Hotel des Monnaies
  • Boileau

See also: fact sheet on station renovations

General project information

Cities

  • Saint-Josse-ten-Noode
  • Brussels city
  • Woluwe-Saint-Lambert
  • Anderlecht
  • Saint-Gilles
  • Koekelberg
  • Molenbeek-Saint-Jean

Contracting authorities

Bruxelles Mobilité

Place Saint-Lazare, 2
1035 Bruxelles
0800 94 001

See all projects